josh 39563f6934 docs(01): plan phase 1 — 7 plans across 3 waves, verified after 1 revision
Wave 1: Plan 01 (scaffold + test infra)
Wave 2: Plans 02 (eslint firewall), 03 (save layer), 04 (content pipeline),
        05 (asset provenance — autonomous:false human-curate checkpoint),
        06 (doctrine docs)
Wave 3: Plan 07 (CI workflow)

All 16 Phase-1 REQ-IDs covered. Plan-checker found 4 blockers + 6 warnings
on first pass; revision iteration 1 landed all 10 fixes; iteration 2
returned VERIFICATION PASSED. Two orchestrator judgment calls during
revision: (1) implement CORE-04 localStorage fallback in Phase 1 (the
literal requirement and ROADMAP success criterion #2 both call for it),
(2) reclassify STRY-09 as vacuously satisfied in Phase 1.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 23:09:08 -04:00

74 lines
3.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-05-08)
**Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins.
**Current focus:** Phase 1 — Foundations & Doctrine
## Current Position
Phase: 1 of 8 (Foundations & Doctrine)
Plan: 0 of 7 in current phase
Status: Planned — ready for `/gsd-execute-phase 1`
Last activity: 2026-05-08 — Phase 1 planning complete. RESEARCH.md → 7 plans across 3 waves → plan-checker found 4 blockers + 6 warnings → revision iteration 1 → VERIFICATION PASSED. Orchestrator authorized two judgment calls during revision: (1) implement CORE-04 localStorage fallback in Phase 1 (~30 LoC + 1 test) rather than defer (the literal requirement and ROADMAP success criterion #2 both call for it); (2) reclassify STRY-09 as vacuously satisfied in Phase 1 (no source code exists yet to externalize from).
Progress: [░░░░░░░░░░] 0%
## Performance Metrics
**Velocity:**
- Total plans completed: 0
- Average duration: —
- Total execution time: 0.0 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1. Foundations & Doctrine | 0/7 | 0 | — |
**Recent Trend:**
- Last 5 plans: —
- Trend: — (no plans completed yet)
*Updated after each plan completion*
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering.
- Phase 2 will ship Season 1 as a complete vertical slice that could *plausibly* ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
- Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
### Pending Todos
None yet.
### Blockers/Concerns
Carry-forward banner concerns from research:
- **7-Season scope risk** is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
- **Story ends but the loop doesn't** — Season 7 end-state design must land in Phase 1 (PIPE-05); finite Roothold ceiling enforced in Phase 4 (SEAS-04); credits/coda rest-state in Phase 7 (SEAS-10).
- **AI asset style drift** — provenance + curation + locked north-star reference set must land in Phase 1 (AEST-08, AEST-09, PIPE-03) before any production-volume asset generation in Phase 5+; visual regression testing in Phase 8 (PIPE-04).
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| *(none)* | | | |
## Session Continuity
Last session: 2026-05-08
Stopped at: Phase 1 planning verified and ready for execution. Wave 1 = Plan 01 (scaffold + test infra). Wave 2 = Plans 0206 (firewall, save layer, content pipeline, asset provenance, doctrine docs) in parallel; Plan 05 has a human-curate checkpoint (autonomous: false) for the 1020 north-star reference set with Path A/B/C fallbacks. Wave 3 = Plan 07 (CI workflow).
Resume file: .planning/phases/01-foundations-and-doctrine/01-VALIDATION.md (per-task verification map populated; all 16 Phase-1 REQ-IDs covered)
Next action: `/gsd-execute-phase 1`