# Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-05-08) **Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins. **Current focus:** Phase 1 — Foundations & Doctrine ## Current Position Phase: 1 of 8 (Foundations & Doctrine) Plan: 0 of 7 in current phase Status: Planned — ready for `/gsd-execute-phase 1` Last activity: 2026-05-08 — Phase 1 planning complete. RESEARCH.md → 7 plans across 3 waves → plan-checker found 4 blockers + 6 warnings → revision iteration 1 → VERIFICATION PASSED. Orchestrator authorized two judgment calls during revision: (1) implement CORE-04 localStorage fallback in Phase 1 (~30 LoC + 1 test) rather than defer (the literal requirement and ROADMAP success criterion #2 both call for it); (2) reclassify STRY-09 as vacuously satisfied in Phase 1 (no source code exists yet to externalize from). Progress: [░░░░░░░░░░] 0% ## Performance Metrics **Velocity:** - Total plans completed: 0 - Average duration: — - Total execution time: 0.0 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1. Foundations & Doctrine | 0/7 | 0 | — | **Recent Trend:** - Last 5 plans: — - Trend: — (no plans completed yet) *Updated after each plan completion* ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering. - Phase 2 will ship Season 1 as a complete vertical slice that could *plausibly* ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk. - Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine. ### Pending Todos None yet. ### Blockers/Concerns Carry-forward banner concerns from research: - **7-Season scope risk** is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap. - **Story ends but the loop doesn't** — Season 7 end-state design must land in Phase 1 (PIPE-05); finite Roothold ceiling enforced in Phase 4 (SEAS-04); credits/coda rest-state in Phase 7 (SEAS-10). - **AI asset style drift** — provenance + curation + locked north-star reference set must land in Phase 1 (AEST-08, AEST-09, PIPE-03) before any production-volume asset generation in Phase 5+; visual regression testing in Phase 8 (PIPE-04). ## Deferred Items Items acknowledged and carried forward from previous milestone close: | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | *(none)* | | | | ## Session Continuity Last session: 2026-05-08 Stopped at: Phase 1 planning verified and ready for execution. Wave 1 = Plan 01 (scaffold + test infra). Wave 2 = Plans 02–06 (firewall, save layer, content pipeline, asset provenance, doctrine docs) in parallel; Plan 05 has a human-curate checkpoint (autonomous: false) for the 10–20 north-star reference set with Path A/B/C fallbacks. Wave 3 = Plan 07 (CI workflow). Resume file: .planning/phases/01-foundations-and-doctrine/01-VALIDATION.md (per-task verification map populated; all 16 Phase-1 REQ-IDs covered) Next action: `/gsd-execute-phase 1`