Files
TheLastGarden/.planning/STATE.md
T
josh 38535bac73 docs(02-01): complete foundations plan
- 02-01-foundations-SUMMARY.md authored with frontmatter dependency
  graph, key-files manifest, decisions log, patterns established,
  test-count breakdown (72 new tests), TICK_MS=200 (no drift), and
  ESLint sim-purity rule landed (defended-option clause did not trigger)
- STATE.md: Phase 2 progress 1/5 plans (Wave 0 complete);
  velocity table updated with Plan 02-01 ~12min entry; decisions log
  cites BLOCKER 3 split, V1Payload extension, ESLint rule
- ROADMAP.md: Phase 2 row updated to 1/5; 02-01 plan marked [x] with
  duration + summary backlink
- REQUIREMENTS.md: CORE-02, CORE-03, CORE-11, UX-10, UX-11 marked
  complete with annotations; traceability table updated

Plan execution metrics:
- 3 atomic commits (58db532, fe99058, 2a8d354)
- 72 new tests across 9 test files (cushion above plan estimate of 54)
- Total test count: 128/128 green
- npm run ci exits 0
- Duration: ~12 min (sequential mode)
2026-05-09 09:26:37 -04:00

126 lines
9.2 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: in_progress
stopped_at: "Phase 2 Wave 0 (Plan 02-01 foundations) complete. 3 atomic commits: 58db532 (BigQty + scheduler + sim foundations), fe99058 (Zustand store + V1Payload extension + save lifecycle hooks), 2a8d354 (eslint sim-purity rule + Date.now violator fixture). 128/128 tests green; npm run ci exits 0. CORE-02 / CORE-03 / CORE-11 / UX-10 / UX-11 foundations all landed and unit-tested. Wave 1 (02-02 begin-plant-grow + 02-03 harvest-journal-fragments) and Wave 2 (02-04 lura-gate-beats + 02-05 letter-settings-e2e) unblocked. Next: /gsd-execute-phase 2 to run Wave 1 in parallel against this Wave-0 foundation."
last_updated: "2026-05-09T13:21:00.000Z"
last_activity: 2026-05-09
progress:
total_phases: 8
completed_phases: 1
total_plans: 8
completed_plans: 8
percent: 14
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-05-08)
**Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins.
**Current focus:** Phase 02 — Season 1 Vertical Slice (Soil) — 5 plans ready; ready for `/gsd-execute-phase 2`
## Current Position
Phase: 02 (season-1-vertical-slice-soil) — Wave 0 complete (1/5 plans)
Plans: 5 of 5 created (3 waves); Wave 0 (02-01) DONE; Waves 1 + 2 ready
Status: Plan 02-01 foundations executed in sequential mode — 3 atomic commits, 72 new tests, npm run ci green. CORE-02 / CORE-03 / CORE-11 / UX-10 / UX-11 foundation requirements landed and unit-tested. Ready for `/gsd-execute-phase 2` to run Wave 1.
Last activity: 2026-05-09 -- Plan 02-01 execute complete
Progress: [█░░░░░░░░░] 14%
## Verification Results
**Phase 1 Overall Verdict:** PASSED
| REQ-ID | Status |
|--------|--------|
| CORE-01 | PASS — scaffold builds; <5s measurement is Phase 2 |
| CORE-04 | PASS — IDB + localStorage fallback; 4 tests green |
| CORE-05 | PASS — navigator.storage.persist() all 4 scenarios |
| CORE-06 | PASS — versioned envelope + CRC-32; tamper detection |
| CORE-07 | PASS — forward-only migration chain; synthetic v0→v1 |
| CORE-08 | PASS — last-3 snapshot retention; 5-then-3 invariant |
| CORE-09 | PASS — Base64 codec + 50MB DoS cap; round-trip test |
| CORE-10 | PASS — ESLint boundaries rule + Vitest proof |
| PIPE-01 | PASS — Vite-native loader; schema violation fails build |
| PIPE-03 | PASS — asset provenance gate; refused-sample fixture |
| PIPE-05 | PASS — both doctrine docs authored + doc-lint tests |
| PIPE-06 | PASS — ci.yml; 53 tests on every push |
| AEST-08 | PASS — ProvenanceSchema 6 fields; CI gate in place |
| AEST-09 | PASS (IOU) — curation gate exists; human decision recorded |
| STRY-09 | PASS (vacuous) — /content/ convention established |
| UX-13 | PASS — anti-fomo-doctrine.md; review-enforced |
Gates run: lint (exit 0), test (53/53 green, 12 files), validate:assets (2 assets valid), build (exit 0), compile:ink (exit 0), ci (exit 0).
## Performance Metrics
**Velocity:**
- Total plans completed: 8 (1 partial — 01-05 Task 2 deferred via IOU)
- Average duration: ~5 min (Wave 1 baseline 6min; Wave 2 plans 48min; Plan 07 ~2min; Plan 02-01 ~12min — Phase-2 foundations are heavier)
- Total execution time: ~42 min across Phase 1 + Phase 2 Wave 0
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1. Foundations & Doctrine | 7/7 (complete) | ~30 min | ~5 min |
| 2. Season 1 Vertical Slice (Soil) | 1/5 (Wave 0 complete) | ~12 min | ~12 min |
**Recent Trend:**
- Last 5 plans: [01-04 content-pipeline · 01-05 asset-provenance (partial) · 01-06 doctrine-docs · 01-07 ci-workflow · 02-01 foundations — all green]
- Trend: ↗ (02-01 was 12 min — heavier than any Phase-1 plan because it covers BigQty + scheduler + Zustand store + save extension + lifecycle hooks + ESLint rule across 3 atomic commits)
*Updated after each plan completion*
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering. COMPLETE.
- Phase 2 will ship Season 1 as a complete vertical slice that could *plausibly* ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
- Plan 02-01 (Wave 0): BLOCKER 3 lastTickAt-vs-tickCount split landed — SimState carries TWO time fields with strict ownership (lastTickAt = wall-clock, app-only writes; tickCount = sim-internal monotonic). simAdapter.applyTickCount is the canonical sim → store path. Pinned by 3 store tests + 1 migrations test.
- Plan 02-01 (Wave 0): V1Payload extended in place per D-34 (no migrations[2]) — Phase-1's v1 has shipped zero production saves so adding fields with defaults in migrations[1] is cleaner. Regression-defense test asserts Object.keys(migrations).sort() === ['1'].
- Plan 02-01 (Wave 0): ESLint sim-purity rule (Block 3 of eslint.config.js) is the mechanical defense for D-33 — bans Date.now() and setInterval in src/sim/** with src/sim/scheduler/clock.ts as the lone exception. Programmatic Vitest test against the date-now-violator fixture proves the rule fires; negative test on clock.ts proves the exception holds.
- Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
- Plan 01-01: scaffolded by hand (the official `npm create @phaserjs/game@latest` is interactive-only — `--template react-ts --yes` flags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted; `build` runs `tsc -b && vite build` so strict-TS gates every build. ESLint 9 installed → Plan 02 must use **flat config** (`eslint.config.js`), not legacy `.eslintrc.*`.
- Plan 01-01: pre-installed `fake-indexeddb@^6` here so Plan 03 doesn't have to re-edit `package.json`. All Phase-1 dep versions match RESEARCH.md exactly within their `^` ranges.
- Plan 01-07: minimum-viable CI workflow (49 lines) running `npm ci` + `npm run ci` on push/PR to main; ubuntu-latest only, Node 22 only, no matrix per CONTEXT user pushback against ceremony. The workflow's role is to refuse merges that break local `npm run ci`, nothing more. New CI gates (Phase 2 e2e, Phase 8 visual regression) are added by editing `package.json scripts.ci` (or new dedicated workflow files), not by editing `ci.yml` — the workflow stays stable across all future phases.
- Plan 01-07: `npm ci` (lockfile-strict) chosen over `npm install` per RESEARCH § Security Domain; `npm audit` deferred to Phase 8. `actions/setup-node@v4` with `cache: 'npm'` per RESEARCH CI Pitfall A — never cache `node_modules/` directly.
- Plan 01-05 Task 2 (north-star images): Deferred via Path C per 01-05-IOU.md. User decision: "I don't really want to deal with creating the art for this." Two placeholder PNGs committed with valid provenance sidecars. Real north-star curation deferred to Phase 5 when production-volume asset generation begins.
### Pending Todos
- **Plan 01-05 Task 2 (human curation) — Phase 5 follow-up:** 10-20 hand-curated AI generations committed to `assets/north-stars/` with provenance sidecars. Non-blocking for Phase 2 (no production AI assets until Phase 5+). Recorded in `01-05-IOU.md` with resolution path.
### Blockers/Concerns
Carry-forward banner concerns from research:
- **7-Season scope risk** is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
- **Story ends but the loop doesn't** — Season 7 end-state design landed in Phase 1 (`.planning/season-7-end-state.md`, PIPE-05 ✓); finite Roothold ceiling enforcement deferred to Phase 4 (SEAS-04); credits/coda rest-state to Phase 7 (SEAS-10).
- **AI asset style drift** — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 1020-image north-star reference set deferred to Phase 5 per IOU (AEST-09 IOU); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).
## Deferred Items
Items acknowledged and carried forward:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| AEST-09 | 10-20 real north-star reference images for visual regression baseline | IOU — Phase 5 follow-up | Phase 1 (01-05-IOU.md) |
## Session Continuity
Last session: 2026-05-09
Stopped at: Phase 2 Wave 0 (Plan 02-01 foundations) executed in sequential mode — 3 atomic commits (58db532, fe99058, 2a8d354), 72 new tests, 128/128 total green, npm run ci exits 0. CORE-02/CORE-03/CORE-11/UX-10/UX-11 building blocks landed and unit-tested. SUMMARY at .planning/phases/02-season-1-vertical-slice-soil/02-01-foundations-SUMMARY.md.
Next action: `/gsd-execute-phase 2` to run Wave 1 (02-02 begin-plant-grow + 02-03 harvest-journal-fragments) in parallel against the Wave-0 foundation. Wave 2 (02-04 + 02-05) follows after Wave 1.