de3f55b1c4b4c43da322cfb91ddad7f2fec788dd
- 02-04-lura-gate-beats-SUMMARY.md created. Documents: - 3 Lura Ink beats authored in bible voice (warmth anchor, contrast not co-griever) - Build-time inklecate compile pipeline with bundled binary (BLOCKER 4 mitigated) - RESEARCH Assumption A6 verified first-try on Windows - 47 new Vitest cases (264/264 total green); npm run ci exits 0 - sim/narrative gating pure-state; STRY-10 mechanically defended - sim/* contains zero inkjs imports; ESLint sim-purity rule still green - 4 lazy code-split chunks emitted for compiled Ink JSON - Compost-toast UI deferred to Plan 02-05 (folded into persistence-toast surface) - 5 auto-fix deviations documented (Rule 1 + Rule 3); 2 tightenings; 0 architectural changes - STATE.md updated: progress 18% → 19%; Phase 2 plans 3/5 → 4/5; 217 → 264 tests; per-phase metrics updated (Phase 2 4/5 plans, ~66min, ~16min/plan). - ROADMAP.md: Plan 02-04 marked complete with duration; progress table updated. - REQUIREMENTS.md: STRY-01 / STRY-06 / STRY-07 / STRY-10 marked complete with full traceability annotations. Plan 02-05 (offline catchup + letter + Settings + Playwright e2e) is the only remaining Phase-2 work. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Description
No description provided
Languages
TypeScript
91.2%
JavaScript
6.7%
Ink
1.8%
CSS
0.2%
HTML
0.1%