Files
TheLastGarden/.planning/STATE.md
T
josh 8ace3db7b4 docs(01-07): complete ci-workflow plan + Phase 1 closure metadata
- 01-07-ci-workflow-SUMMARY.md: structural enforcement map, Phase 2/8 handoff notes, threat T-01-08 mitigation confirmed
- 01-VALIDATION.md: per-task table populated (12/13 green, 01-05-T2 partial — checkpoint:human-verify awaiting north-star image curation); status flipped to executed
- ROADMAP.md: progress table marks Phase 1 as 7/7 with 01-05 partial annotation
- STATE.md: position advanced to Plan 7 of 7 complete; performance trend; Plan 01-05 Task 2 explicitly tracked as the only outstanding deliverable; next action = human curation pass then /gsd-verify-work
- REQUIREMENTS.md: PIPE-06 marked complete (CI workflow runs Vitest on every push/PR)
2026-05-09 00:00:23 -04:00

98 lines
6.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: executing
stopped_at: "Phase 1 closure: Plans 01-01..01-04, 01-06, 01-07 complete; Plan 01-05 Task 1 (validator + refused-sample fixture) merged but Task 2 (1020 north-star reference images) awaits human curation per the planned checkpoint:human-verify gate. CI workflow shippable today (validator green with 0 assets; will continue green once images land). Next: /gsd-verify-work to UAT Phase 1, then human curation pass on north-star images, then /gsd-discuss-phase 2."
last_updated: "2026-05-09T03:56:45.284Z"
last_activity: 2026-05-09
progress:
total_phases: 8
completed_phases: 0
total_plans: 7
completed_plans: 7
percent: 100
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-05-08)
**Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins.
**Current focus:** Phase 01 — foundations-and-doctrine
## Current Position
Phase: 01 (foundations-and-doctrine) — AWAITING VERIFICATION + HUMAN CURATION
Plan: 7 of 7 complete (01-05 Task 2 partial — north-star image curation outstanding)
Status: All Phase-1 automation green; ready for /gsd-verify-work UAT and human curation pass on north-star reference set
Last activity: 2026-05-09 -- Plan 01-07 (CI workflow) complete; PIPE-06 enforced
Progress: [██████████] 100%
## Performance Metrics
**Velocity:**
- Total plans completed: 7 (1 partial)
- Average duration: ~5 min (Wave 1 baseline 6min; Wave 2 plans 48min; Plan 07 ~2min)
- Total execution time: ~30 min across all of Phase 1
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1. Foundations & Doctrine | 7/7 (1 partial) | ~30 min | ~5 min |
**Recent Trend:**
- Last 5 plans: [01-03 save-layer · 01-04 content-pipeline · 01-05 asset-provenance (partial) · 01-06 doctrine-docs · 01-07 ci-workflow — all green]
- Trend: ↘ (Wave 2/3 plans came in faster than Wave 1's scaffolding; YAML-only Plan 07 was the cheapest at ~2min)
*Updated after each plan completion*
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering.
- Phase 2 will ship Season 1 as a complete vertical slice that could *plausibly* ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
- Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
- Plan 01-01: scaffolded by hand (the official `npm create @phaserjs/game@latest` is interactive-only — `--template react-ts --yes` flags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted; `build` runs `tsc -b && vite build` so strict-TS gates every build. ESLint 9 installed → Plan 02 must use **flat config** (`eslint.config.js`), not legacy `.eslintrc.*`.
- Plan 01-01: pre-installed `fake-indexeddb@^6` here so Plan 03 doesn't have to re-edit `package.json`. All Phase-1 dep versions match RESEARCH.md exactly within their `^` ranges.
- Plan 01-07: minimum-viable CI workflow (49 lines) running `npm ci` + `npm run ci` on push/PR to main; ubuntu-latest only, Node 22 only, no matrix per CONTEXT user pushback against ceremony. The workflow's role is to refuse merges that break local `npm run ci`, nothing more. New CI gates (Phase 2 e2e, Phase 8 visual regression) are added by editing `package.json scripts.ci` (or new dedicated workflow files), not by editing `ci.yml` — the workflow stays stable across all future phases.
- Plan 01-07: `npm ci` (lockfile-strict) chosen over `npm install` per RESEARCH § Security Domain; `npm audit` deferred to Phase 8. `actions/setup-node@v4` with `cache: 'npm'` per RESEARCH CI Pitfall A — never cache `node_modules/` directly.
### Pending Todos
- **Plan 01-05 Task 2 (human curation):** 1020 hand-curated AI generations need to be committed to `assets/north-stars/` with provenance sidecars. Each must pass the curation gate (visual consistency, real-species-slightly-wrong, watercolor register). The validator (`npm run validate:assets`) is green today with 0 assets and will continue green when the images land. This is the only outstanding Phase 1 deliverable before `/gsd-verify-work`.
### Blockers/Concerns
Carry-forward banner concerns from research:
- **7-Season scope risk** is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
- **Story ends but the loop doesn't** — Season 7 end-state design landed in Phase 1 (`.planning/season-7-end-state.md`, PIPE-05 ✓); finite Roothold ceiling enforcement deferred to Phase 4 (SEAS-04); credits/coda rest-state to Phase 7 (SEAS-10).
- **AI asset style drift** — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 1020-image north-star reference set still pending human curation (Plan 01-05 Task 2 — AEST-09 partial); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).
- **Phase 1 partial closure:** Plan 01-05 Task 2 is the only outstanding deliverable. The CI workflow (Plan 01-07) is shippable today regardless. `/gsd-verify-work` can run after the curation pass.
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| *(none)* | | | |
## Session Continuity
Last session: 2026-05-09
Stopped at: Plan 01-07 (CI workflow) complete — `.github/workflows/ci.yml` (49 lines, Node 22, ubuntu-latest, single job) runs `npm ci` + `npm run ci` on push/PR to main. Local `npm run ci` exits 0 (lint clean / 53 tests pass / validator OK / build OK). Every Phase 1 success criterion now structurally enforced on every commit. Plan 01-05 Task 2 (north-star image curation) is the only outstanding deliverable — does not block CI workflow shipping. Phase 1 awaiting `/gsd-verify-work` UAT after the curation pass.
Resume file: .planning/phases/01-foundations-and-doctrine/01-07-ci-workflow-SUMMARY.md
Next action: human curation pass on `assets/north-stars/` (Plan 01-05 Task 2), then `/gsd-verify-work` to UAT Phase 1, then `/gsd-discuss-phase 2`