josh 8ace3db7b4 docs(01-07): complete ci-workflow plan + Phase 1 closure metadata
- 01-07-ci-workflow-SUMMARY.md: structural enforcement map, Phase 2/8 handoff notes, threat T-01-08 mitigation confirmed
- 01-VALIDATION.md: per-task table populated (12/13 green, 01-05-T2 partial — checkpoint:human-verify awaiting north-star image curation); status flipped to executed
- ROADMAP.md: progress table marks Phase 1 as 7/7 with 01-05 partial annotation
- STATE.md: position advanced to Plan 7 of 7 complete; performance trend; Plan 01-05 Task 2 explicitly tracked as the only outstanding deliverable; next action = human curation pass then /gsd-verify-work
- REQUIREMENTS.md: PIPE-06 marked complete (CI workflow runs Vitest on every push/PR)
2026-05-09 00:00:23 -04:00

6.7 KiB
Raw Blame History

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone executing Phase 1 closure: Plans 01-01..01-04, 01-06, 01-07 complete; Plan 01-05 Task 1 (validator + refused-sample fixture) merged but Task 2 (1020 north-star reference images) awaits human curation per the planned checkpoint:human-verify gate. CI workflow shippable today (validator green with 0 assets; will continue green once images land). Next: /gsd-verify-work to UAT Phase 1, then human curation pass on north-star images, then /gsd-discuss-phase 2. 2026-05-09T03:56:45.284Z 2026-05-09
total_phases completed_phases total_plans completed_plans percent
8 0 7 7 100

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-05-08)

Core value: Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins. Current focus: Phase 01 — foundations-and-doctrine

Current Position

Phase: 01 (foundations-and-doctrine) — AWAITING VERIFICATION + HUMAN CURATION Plan: 7 of 7 complete (01-05 Task 2 partial — north-star image curation outstanding) Status: All Phase-1 automation green; ready for /gsd-verify-work UAT and human curation pass on north-star reference set Last activity: 2026-05-09 -- Plan 01-07 (CI workflow) complete; PIPE-06 enforced

Progress: [██████████] 100%

Performance Metrics

Velocity:

  • Total plans completed: 7 (1 partial)
  • Average duration: ~5 min (Wave 1 baseline 6min; Wave 2 plans 48min; Plan 07 ~2min)
  • Total execution time: ~30 min across all of Phase 1

By Phase:

Phase Plans Total Avg/Plan
1. Foundations & Doctrine 7/7 (1 partial) ~30 min ~5 min

Recent Trend:

  • Last 5 plans: [01-03 save-layer · 01-04 content-pipeline · 01-05 asset-provenance (partial) · 01-06 doctrine-docs · 01-07 ci-workflow — all green]
  • Trend: ↘ (Wave 2/3 plans came in faster than Wave 1's scaffolding; YAML-only Plan 07 was the cheapest at ~2min)

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering.
  • Phase 2 will ship Season 1 as a complete vertical slice that could plausibly ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
  • Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
  • Plan 01-01: scaffolded by hand (the official npm create @phaserjs/game@latest is interactive-only — --template react-ts --yes flags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted; build runs tsc -b && vite build so strict-TS gates every build. ESLint 9 installed → Plan 02 must use flat config (eslint.config.js), not legacy .eslintrc.*.
  • Plan 01-01: pre-installed fake-indexeddb@^6 here so Plan 03 doesn't have to re-edit package.json. All Phase-1 dep versions match RESEARCH.md exactly within their ^ ranges.
  • Plan 01-07: minimum-viable CI workflow (49 lines) running npm ci + npm run ci on push/PR to main; ubuntu-latest only, Node 22 only, no matrix per CONTEXT user pushback against ceremony. The workflow's role is to refuse merges that break local npm run ci, nothing more. New CI gates (Phase 2 e2e, Phase 8 visual regression) are added by editing package.json scripts.ci (or new dedicated workflow files), not by editing ci.yml — the workflow stays stable across all future phases.
  • Plan 01-07: npm ci (lockfile-strict) chosen over npm install per RESEARCH § Security Domain; npm audit deferred to Phase 8. actions/setup-node@v4 with cache: 'npm' per RESEARCH CI Pitfall A — never cache node_modules/ directly.

Pending Todos

  • Plan 01-05 Task 2 (human curation): 1020 hand-curated AI generations need to be committed to assets/north-stars/ with provenance sidecars. Each must pass the curation gate (visual consistency, real-species-slightly-wrong, watercolor register). The validator (npm run validate:assets) is green today with 0 assets and will continue green when the images land. This is the only outstanding Phase 1 deliverable before /gsd-verify-work.

Blockers/Concerns

Carry-forward banner concerns from research:

  • 7-Season scope risk is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
  • Story ends but the loop doesn't — Season 7 end-state design landed in Phase 1 (.planning/season-7-end-state.md, PIPE-05 ✓); finite Roothold ceiling enforcement deferred to Phase 4 (SEAS-04); credits/coda rest-state to Phase 7 (SEAS-10).
  • AI asset style drift — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 1020-image north-star reference set still pending human curation (Plan 01-05 Task 2 — AEST-09 partial); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).
  • Phase 1 partial closure: Plan 01-05 Task 2 is the only outstanding deliverable. The CI workflow (Plan 01-07) is shippable today regardless. /gsd-verify-work can run after the curation pass.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-05-09 Stopped at: Plan 01-07 (CI workflow) complete — .github/workflows/ci.yml (49 lines, Node 22, ubuntu-latest, single job) runs npm ci + npm run ci on push/PR to main. Local npm run ci exits 0 (lint clean / 53 tests pass / validator OK / build OK). Every Phase 1 success criterion now structurally enforced on every commit. Plan 01-05 Task 2 (north-star image curation) is the only outstanding deliverable — does not block CI workflow shipping. Phase 1 awaiting /gsd-verify-work UAT after the curation pass. Resume file: .planning/phases/01-foundations-and-doctrine/01-07-ci-workflow-SUMMARY.md Next action: human curation pass on assets/north-stars/ (Plan 01-05 Task 2), then /gsd-verify-work to UAT Phase 1, then /gsd-discuss-phase 2