Phase 2 discuss-phase complete; STATE.md now reflects context-gathered status, updated stopped_at narrative, and next-action pointer to /gsd-plan-phase 2. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
7.9 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | in_progress | Phase 2 context gathered. 02-CONTEXT.md captures 34 implementation decisions across 8 gray areas (geometry, time density, Lura's arc, letter composition, begin screen, journal, plant placeholders, settings UI scope). Locked: 4×4 grid, click+inline seed picker, 2–3 plants (1-from-start + fragment-count unlocks), infinite seeds, 2–5min growth band per plant, auto-harvest offline / manual active, 3 Lura gate visits gated by 1st/4th/8th harvest, authored Ink letter skeleton + slots, full-screen letter ≥5min absence, tasteful placeholder Begin (skip-on-return), full-screen Journal modal revealing after 1st harvest, Phaser-primitive plants with glow/pulse ready cue, save-management-only Settings. Phase 2's first commits: BigQty wrapper, Zustand store, tick scheduler. Save schema is a v1 *extension*, not a v1→v2 migration. Next: /gsd-plan-phase 2. | 2026-05-09T00:50:00.000Z | 2026-05-09 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-05-08)
Core value: Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins.
Current focus: Phase 02 — Season 1 Vertical Slice (Soil) — context gathered; ready for /gsd-plan-phase 2
Current Position
Phase: 02 (season-1-vertical-slice-soil) — context gathered
Plans: 0 of TBD (planning is the next step)
Status: 02-CONTEXT.md written with 34 decisions; ready for /gsd-plan-phase 2
Last activity: 2026-05-09 -- Phase 2 discuss-phase complete
Progress: [█░░░░░░░░░] 12%
Verification Results
Phase 1 Overall Verdict: PASSED
| REQ-ID | Status |
|---|---|
| CORE-01 | PASS — scaffold builds; <5s measurement is Phase 2 |
| CORE-04 | PASS — IDB + localStorage fallback; 4 tests green |
| CORE-05 | PASS — navigator.storage.persist() all 4 scenarios |
| CORE-06 | PASS — versioned envelope + CRC-32; tamper detection |
| CORE-07 | PASS — forward-only migration chain; synthetic v0→v1 |
| CORE-08 | PASS — last-3 snapshot retention; 5-then-3 invariant |
| CORE-09 | PASS — Base64 codec + 50MB DoS cap; round-trip test |
| CORE-10 | PASS — ESLint boundaries rule + Vitest proof |
| PIPE-01 | PASS — Vite-native loader; schema violation fails build |
| PIPE-03 | PASS — asset provenance gate; refused-sample fixture |
| PIPE-05 | PASS — both doctrine docs authored + doc-lint tests |
| PIPE-06 | PASS — ci.yml; 53 tests on every push |
| AEST-08 | PASS — ProvenanceSchema 6 fields; CI gate in place |
| AEST-09 | PASS (IOU) — curation gate exists; human decision recorded |
| STRY-09 | PASS (vacuous) — /content/ convention established |
| UX-13 | PASS — anti-fomo-doctrine.md; review-enforced |
Gates run: lint (exit 0), test (53/53 green, 12 files), validate:assets (2 assets valid), build (exit 0), compile:ink (exit 0), ci (exit 0).
Performance Metrics
Velocity:
- Total plans completed: 7 (1 partial — 01-05 Task 2 deferred via IOU)
- Average duration: ~5 min (Wave 1 baseline 6min; Wave 2 plans 4–8min; Plan 07 ~2min)
- Total execution time: ~30 min across all of Phase 1
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1. Foundations & Doctrine | 7/7 (complete) | ~30 min | ~5 min |
Recent Trend:
- Last 5 plans: [01-03 save-layer · 01-04 content-pipeline · 01-05 asset-provenance (partial) · 01-06 doctrine-docs · 01-07 ci-workflow — all green]
- Trend: ↘ (Wave 2/3 plans came in faster than Wave 1's scaffolding; YAML-only Plan 07 was the cheapest at ~2min)
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering. COMPLETE.
- Phase 2 will ship Season 1 as a complete vertical slice that could plausibly ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
- Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
- Plan 01-01: scaffolded by hand (the official
npm create @phaserjs/game@latestis interactive-only —--template react-ts --yesflags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted;buildrunstsc -b && vite buildso strict-TS gates every build. ESLint 9 installed → Plan 02 must use flat config (eslint.config.js), not legacy.eslintrc.*. - Plan 01-01: pre-installed
fake-indexeddb@^6here so Plan 03 doesn't have to re-editpackage.json. All Phase-1 dep versions match RESEARCH.md exactly within their^ranges. - Plan 01-07: minimum-viable CI workflow (49 lines) running
npm ci+npm run cion push/PR to main; ubuntu-latest only, Node 22 only, no matrix per CONTEXT user pushback against ceremony. The workflow's role is to refuse merges that break localnpm run ci, nothing more. New CI gates (Phase 2 e2e, Phase 8 visual regression) are added by editingpackage.json scripts.ci(or new dedicated workflow files), not by editingci.yml— the workflow stays stable across all future phases. - Plan 01-07:
npm ci(lockfile-strict) chosen overnpm installper RESEARCH § Security Domain;npm auditdeferred to Phase 8.actions/setup-node@v4withcache: 'npm'per RESEARCH CI Pitfall A — never cachenode_modules/directly. - Plan 01-05 Task 2 (north-star images): Deferred via Path C per 01-05-IOU.md. User decision: "I don't really want to deal with creating the art for this." Two placeholder PNGs committed with valid provenance sidecars. Real north-star curation deferred to Phase 5 when production-volume asset generation begins.
Pending Todos
- Plan 01-05 Task 2 (human curation) — Phase 5 follow-up: 10-20 hand-curated AI generations committed to
assets/north-stars/with provenance sidecars. Non-blocking for Phase 2 (no production AI assets until Phase 5+). Recorded in01-05-IOU.mdwith resolution path.
Blockers/Concerns
Carry-forward banner concerns from research:
- 7-Season scope risk is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
- Story ends but the loop doesn't — Season 7 end-state design landed in Phase 1 (
.planning/season-7-end-state.md, PIPE-05 ✓); finite Roothold ceiling enforcement deferred to Phase 4 (SEAS-04); credits/coda rest-state to Phase 7 (SEAS-10). - AI asset style drift — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 10–20-image north-star reference set deferred to Phase 5 per IOU (AEST-09 IOU); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).
Deferred Items
Items acknowledged and carried forward:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| AEST-09 | 10-20 real north-star reference images for visual regression baseline | IOU — Phase 5 follow-up | Phase 1 (01-05-IOU.md) |
Session Continuity
Last session: 2026-05-09
Stopped at: Phase 2 context gathered — 02-CONTEXT.md and 02-DISCUSSION-LOG.md written, 8 gray areas discussed, 34 decisions captured. Phase 1 still verified complete; Phase 2 builds on its save layer + content pipeline + ESLint firewall + doctrine docs.
Next action: /gsd-plan-phase 2 to plan the Season 1 Vertical Slice