verify(01): phase 1 verification — all 16 REQ-IDs PASS, CI green
All 16 Phase-1 requirements verified against the live codebase:
- CORE-01, CORE-04..CORE-10: scaffold builds; save layer (IDB + fallback,
  envelope, migrations, snapshots, persist, codec) all green (53 tests / 12 files)
- PIPE-01: Vite-native content pipeline; schema violation fails build
- PIPE-03: asset provenance gate; refused-sample fixture proves gate structure
- PIPE-05: both doctrine docs authored + 8 doc-lint assertions green
- PIPE-06: ci.yml runs npm run ci on every push + PR
- AEST-08: ProvenanceSchema 6 fields; CI gate on every commit
- AEST-09: human curation gate in place; IOU records Path C deferral to Phase 5
- STRY-09: /content/ convention established (vacuously satisfied in Phase 1)
- UX-13: anti-fomo-doctrine.md authored + review-enforced

Deferred (non-blocking): 10-20 real north-star images (AEST-09 Task 2) — Phase 5.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-09 00:17:20 -04:00

7.4 KiB
Raw Blame History

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone complete Phase 1 complete. All 16 REQ-IDs verified (CORE-01, CORE-04..CORE-10, PIPE-01, PIPE-03, PIPE-05, PIPE-06, AEST-08, AEST-09, STRY-09, UX-13). CI chain green: lint + 53 tests + validate-assets + build all exit 0. One known deferred item: 10-20 real north-star reference images (AEST-09 Task 2) recorded in 01-05-IOU.md — Phase 5 follow-up, does not block Phase 2. Next: /gsd-discuss-phase 2. 2026-05-09T00:20:00.000Z 2026-05-09
total_phases completed_phases total_plans completed_plans percent
8 1 7 7 12

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-05-08)

Core value: Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins. Current focus: Phase 02 — Season 1 Vertical Slice (Soil) — READY TO BEGIN

Current Position

Phase: 01 (foundations-and-doctrine) — COMPLETE (verified 2026-05-09) Plan: 7 of 7 complete Status: All 16 Phase-1 REQ-IDs verified; CI green; ready for Phase 2 Last activity: 2026-05-09 -- Phase 1 verification complete

Progress: [█░░░░░░░░░] 12%

Verification Results

Phase 1 Overall Verdict: PASSED

REQ-ID Status
CORE-01 PASS — scaffold builds; <5s measurement is Phase 2
CORE-04 PASS — IDB + localStorage fallback; 4 tests green
CORE-05 PASS — navigator.storage.persist() all 4 scenarios
CORE-06 PASS — versioned envelope + CRC-32; tamper detection
CORE-07 PASS — forward-only migration chain; synthetic v0→v1
CORE-08 PASS — last-3 snapshot retention; 5-then-3 invariant
CORE-09 PASS — Base64 codec + 50MB DoS cap; round-trip test
CORE-10 PASS — ESLint boundaries rule + Vitest proof
PIPE-01 PASS — Vite-native loader; schema violation fails build
PIPE-03 PASS — asset provenance gate; refused-sample fixture
PIPE-05 PASS — both doctrine docs authored + doc-lint tests
PIPE-06 PASS — ci.yml; 53 tests on every push
AEST-08 PASS — ProvenanceSchema 6 fields; CI gate in place
AEST-09 PASS (IOU) — curation gate exists; human decision recorded
STRY-09 PASS (vacuous) — /content/ convention established
UX-13 PASS — anti-fomo-doctrine.md; review-enforced

Gates run: lint (exit 0), test (53/53 green, 12 files), validate:assets (2 assets valid), build (exit 0), compile:ink (exit 0), ci (exit 0).

Performance Metrics

Velocity:

  • Total plans completed: 7 (1 partial — 01-05 Task 2 deferred via IOU)
  • Average duration: ~5 min (Wave 1 baseline 6min; Wave 2 plans 48min; Plan 07 ~2min)
  • Total execution time: ~30 min across all of Phase 1

By Phase:

Phase Plans Total Avg/Plan
1. Foundations & Doctrine 7/7 (complete) ~30 min ~5 min

Recent Trend:

  • Last 5 plans: [01-03 save-layer · 01-04 content-pipeline · 01-05 asset-provenance (partial) · 01-06 doctrine-docs · 01-07 ci-workflow — all green]
  • Trend: ↘ (Wave 2/3 plans came in faster than Wave 1's scaffolding; YAML-only Plan 07 was the cheapest at ~2min)

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering. COMPLETE.
  • Phase 2 will ship Season 1 as a complete vertical slice that could plausibly ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
  • Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
  • Plan 01-01: scaffolded by hand (the official npm create @phaserjs/game@latest is interactive-only — --template react-ts --yes flags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted; build runs tsc -b && vite build so strict-TS gates every build. ESLint 9 installed → Plan 02 must use flat config (eslint.config.js), not legacy .eslintrc.*.
  • Plan 01-01: pre-installed fake-indexeddb@^6 here so Plan 03 doesn't have to re-edit package.json. All Phase-1 dep versions match RESEARCH.md exactly within their ^ ranges.
  • Plan 01-07: minimum-viable CI workflow (49 lines) running npm ci + npm run ci on push/PR to main; ubuntu-latest only, Node 22 only, no matrix per CONTEXT user pushback against ceremony. The workflow's role is to refuse merges that break local npm run ci, nothing more. New CI gates (Phase 2 e2e, Phase 8 visual regression) are added by editing package.json scripts.ci (or new dedicated workflow files), not by editing ci.yml — the workflow stays stable across all future phases.
  • Plan 01-07: npm ci (lockfile-strict) chosen over npm install per RESEARCH § Security Domain; npm audit deferred to Phase 8. actions/setup-node@v4 with cache: 'npm' per RESEARCH CI Pitfall A — never cache node_modules/ directly.
  • Plan 01-05 Task 2 (north-star images): Deferred via Path C per 01-05-IOU.md. User decision: "I don't really want to deal with creating the art for this." Two placeholder PNGs committed with valid provenance sidecars. Real north-star curation deferred to Phase 5 when production-volume asset generation begins.

Pending Todos

  • Plan 01-05 Task 2 (human curation) — Phase 5 follow-up: 10-20 hand-curated AI generations committed to assets/north-stars/ with provenance sidecars. Non-blocking for Phase 2 (no production AI assets until Phase 5+). Recorded in 01-05-IOU.md with resolution path.

Blockers/Concerns

Carry-forward banner concerns from research:

  • 7-Season scope risk is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
  • Story ends but the loop doesn't — Season 7 end-state design landed in Phase 1 (.planning/season-7-end-state.md, PIPE-05 ✓); finite Roothold ceiling enforcement deferred to Phase 4 (SEAS-04); credits/coda rest-state to Phase 7 (SEAS-10).
  • AI asset style drift — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 1020-image north-star reference set deferred to Phase 5 per IOU (AEST-09 IOU); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).

Deferred Items

Items acknowledged and carried forward:

Category Item Status Deferred At
AEST-09 10-20 real north-star reference images for visual regression baseline IOU — Phase 5 follow-up Phase 1 (01-05-IOU.md)

Session Continuity

Last session: 2026-05-09 Stopped at: Phase 1 verification complete — VERIFICATION.md written, REQUIREMENTS.md updated (16 REQ-IDs marked Complete), STATE.md updated to status: complete. All gates green (lint, 53 tests, validate:assets, build, CI chain). Next action: /gsd-discuss-phase 2 to begin Season 1 Vertical Slice (Soil)