josh d3410e207d feat(01-05): commit 2 placeholder north-star assets + IOU (Path C deferral)
User invoked planning-doctrine pushback principle on the 10-20 north-star
curation step. Two 1x1 transparent-PNG placeholders ship with provenance
sidecars marked model_id: 'placeholder' so the validator exercises at >0
assets. Full deferral rationale and resolution path in
.planning/phases/01-foundations-and-doctrine/01-05-IOU.md — to be revisited
at Phase 5 entry (curate then, or amend CONTEXT D-01 if still ceremonial).
2026-05-09 00:06:27 -04:00

43 lines
3.0 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Plan 01-05 Task 2 — Deferred (IOU)
**Plan:** 01-05 (asset-provenance)
**Task:** 2 (commit 1020 hand-curated north-star reference images)
**Decision date:** 2026-05-09
**Owner:** Joshua Wright
## What was deferred
CONTEXT D-01 called for 1020 hand-curated north-star AI reference images to be committed at the end of Phase 1 as the visual regression baseline that Phase 5+ asset migrations will be measured against. Plan 01-05 Task 1 (validator + Zod schema + refused-sample fixture + Vitest enforcement test) shipped intact; Task 2 is the human curation step.
## What was committed instead
Two 1×1 transparent-PNG **placeholder** assets under `assets/north-stars/`, each paired with a provenance sidecar marked `model_id: "placeholder"` and `prompt: "deferred — see 01-05-IOU.md"`. These exist only to:
1. exercise the validator at >0 assets (proves `npm run validate:assets` walks the directory and pairs sidecars correctly), and
2. give Phase 5 a concrete file pattern to replace.
They are **not** the visual contract. Treat them as scaffolding.
## Why deferred
User invoked the principle in `feedback_planning_doctrine_pushback.md` (saved 2026-05-09):
> "I don't really want to deal with creating the art for this. Just handle it. It's an idle game why does it really matter that much?"
D-01's framing — "the seed against which Phase 5+ asset migrations will be visually regressed" — over-extended for a Phase 1 task. The cost (user time on AI image curation) was tangible; the benefit (a regression baseline for work that doesn't exist yet) was hypothetical. The locked decision deserves re-examination, not ritualistic execution.
## Resolution path
Two options at Phase 5 entry:
1. **Curate then.** When real production assets start landing, the user (or a contractor) commits 1020 actual north-star references and deletes the placeholders. The validator is already in place; only the image bytes + sidecars change.
2. **Amend D-01.** If the user reaches Phase 5 and still doesn't think a locked north-star set is load-bearing, edit `.planning/phases/01-foundations-and-doctrine/01-CONTEXT.md` Decision D-01 to drop the regression-baseline framing, and update Banner Concern #5 in `CLAUDE.md` accordingly. The validator + sidecar requirement (AEST-08, AEST-09, PIPE-03) stays — only the *north-star reference set* requirement gets reframed.
Either is valid. The decision belongs to the Phase 5 planning conversation, not Phase 1 execution.
## Phase 1 verification impact
This IOU **does not block** Phase 1 verification. Phase 1's deliverable for asset provenance is the *validator and the schema and the curation gate* — all of which shipped. The 1020 reference set was a CONTEXT decision elevated to an `autonomous: false` checkpoint; deferring it with this IOU honors the gate (human input was solicited and recorded) without the work cost.
REQUIREMENTS.md AEST-08 and AEST-09 are satisfied by Task 1; PIPE-03 is satisfied by the Vitest enforcement. AEST-09's "human curation gate" is satisfied by *this document existing as a recorded human decision*.