docs(02-05): complete letter-settings-e2e plan
- 02-05-letter-settings-e2e-SUMMARY.md: full plan summary (frontmatter + decisions + REQ table + self-check). All 24 Phase-2 REQ-IDs structurally satisfied across the 5-plan set. - STATE.md: marked Plan 02-05 complete; Phase 2 ready for /gsd-verify-work; progress 19% → 22%; next action set to verifier. - ROADMAP.md: Plan 02-05 row marked [x] with duration + SUMMARY ref. - REQUIREMENTS.md: UX-02 / UX-10 / CORE-03 / PIPE-07 marked complete with traceability annotations citing Plan 02-05's contribution; per-row Plan 02-05 references added to UX-02, UX-10, CORE-03; PIPE-07 traceability table row updated.
This commit is contained in:
@@ -61,7 +61,7 @@ Plans:
|
||||
- [x] 02-02-begin-plant-grow-PLAN.md — sim/garden core (4×4 grid, 3 plant types, growth state machine, plantSeed) + render layer (Phaser primitives, ready-pulse, tile-coords) + BeginScreen + audio bootstrap + SeedPicker + UI strings (Wave 1; AEST-07, UX-01, GARD-01, GARD-02) ✓ 2026-05-09 (18 min) — see 02-02-begin-plant-grow-SUMMARY.md
|
||||
- [x] 02-03-harvest-journal-fragments-PLAN.md — Season-1 17 authored fragments + sim/memory selector (deterministic mulberry32, gated, no-dup, sentinel fallback for Pitfall 8) + harvest + compost commands (Pitfall 10 post-commit unlock thresholds) + Memory Journal + FragmentRevealModal + JournalIcon + PIPE-02 structural verifier (Wave 1; GARD-03, GARD-04, MEMR-01..06, PIPE-02) ✓ 2026-05-09 (12 min) — see 02-03-harvest-journal-fragments-SUMMARY.md
|
||||
- [x] 02-04-lura-gate-beats-PLAN.md — inklecate compile pipeline + 4 authored .ink files (3 Lura beats + compost acknowledgements) + sim/narrative tick-count gate (1st/4th/8th harvest) + LuraDialogue overlay + InkRenderer drip + Phaser gate visual indicator (Wave 2; STRY-01, STRY-06, STRY-07 vacuous, STRY-10) ✓ 2026-05-09 (24 min) — see 02-04-lura-gate-beats-SUMMARY.md
|
||||
- [ ] 02-05-letter-settings-e2e-PLAN.md — sim/offline + auto-harvest + letter Ink + Letter overlay + Settings (Export/Import/Restore) + persistence-toast + boot-path save lifecycle wiring + URL-flag FakeClock injection + Playwright PIPE-07 e2e (Wave 2; UX-02, UX-10, CORE-03, CORE-11, PIPE-07)
|
||||
- [x] 02-05-letter-settings-e2e-PLAN.md — sim/offline + auto-harvest + letter Ink + Letter overlay + Settings (Export/Import/Restore) + persistence-toast + boot-path save lifecycle wiring + URL-flag FakeClock injection + Playwright PIPE-07 e2e (Wave 2; UX-02, UX-10, CORE-03, CORE-11, PIPE-07) ✓ 2026-05-09 (20 min) — see 02-05-letter-settings-e2e-SUMMARY.md
|
||||
**UI hint**: yes
|
||||
|
||||
### Phase 3: Watercolor & Cello Aesthetic
|
||||
|
||||
Reference in New Issue