docs(02-02): complete begin-plant-grow plan

- Add 02-02-begin-plant-grow-SUMMARY.md (3 atomic commits, 35 new tests, BLOCKER 3 invariant honored, RESEARCH Assumption A5 verified, deviations documented)
- STATE.md — advance to Plan 02-02 complete (2/5 plans in Phase 2; 9 total plans complete)
- ROADMAP.md — mark 02-02 plan complete; phase progress 2/5
- REQUIREMENTS.md — mark GARD-01, GARD-02, AEST-07, UX-01 complete (with traceability comments)
This commit is contained in:
2026-05-09 09:50:05 -04:00
parent 414a554549
commit d052a35478
4 changed files with 276 additions and 28 deletions
+2 -2
View File
@@ -58,7 +58,7 @@ Plans:
**Plans:** 5 plans
Plans:
- [x] 02-01-foundations-PLAN.md — BigQty + Zustand 5 store + tick scheduler + V1Payload extension + save lifecycle hooks + Phaser EventBus singleton + ESLint sim-purity rule (Wave 0; foundations every other Phase-2 plan depends on) ✓ 2026-05-09 (12 min) — see 02-01-foundations-SUMMARY.md
- [ ] 02-02-begin-plant-grow-PLAN.md — sim/garden core (4×4 grid, 3 plant types, growth state machine, plantSeed) + render layer (Phaser primitives, ready-pulse, tile-coords) + BeginScreen + audio bootstrap + SeedPicker + UI strings (Wave 1; AEST-07, UX-01, GARD-01, GARD-02)
- [x] 02-02-begin-plant-grow-PLAN.md — sim/garden core (4×4 grid, 3 plant types, growth state machine, plantSeed) + render layer (Phaser primitives, ready-pulse, tile-coords) + BeginScreen + audio bootstrap + SeedPicker + UI strings (Wave 1; AEST-07, UX-01, GARD-01, GARD-02) ✓ 2026-05-09 (18 min) — see 02-02-begin-plant-grow-SUMMARY.md
- [ ] 02-03-harvest-journal-fragments-PLAN.md — Season-1 ≥10 authored fragments + sim/memory selector (deterministic, gated, no-dup, exhaustion) + harvest + compost + Memory Journal + FragmentRevealModal + JournalIcon + PIPE-02 structural verification (Wave 1; GARD-03, GARD-04, MEMR-01..06, PIPE-02)
- [ ] 02-04-lura-gate-beats-PLAN.md — inklecate compile pipeline + 4 authored .ink files (3 Lura beats + compost acknowledgements) + sim/narrative tick-count gate (1st/4th/8th harvest) + LuraDialogue overlay + InkRenderer drip + Phaser gate visual indicator (Wave 2; STRY-01, STRY-06, STRY-07 vacuous, STRY-10)
- [ ] 02-05-letter-settings-e2e-PLAN.md — sim/offline + auto-harvest + letter Ink + Letter overlay + Settings (Export/Import/Restore) + persistence-toast + boot-path save lifecycle wiring + URL-flag FakeClock injection + Playwright PIPE-07 e2e (Wave 2; UX-02, UX-10, CORE-03, CORE-11, PIPE-07)
@@ -150,7 +150,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6 → 7 → 8
| Phase | Plans Complete | Status | Completed |
|-------|----------------|--------|-----------|
| 1. Foundations & Doctrine | 7/7 (01-05 Task 2 partial — north-star images awaiting human curation; CI shippable today) | In Progress | - |
| 2. Season 1 Vertical Slice (Soil) | 1/5 (Wave 0 foundations complete) | In Progress | - |
| 2. Season 1 Vertical Slice (Soil) | 2/5 (Wave 0 + Wave 1 first plan complete; 02-03 next) | In Progress | - |
| 3. Watercolor & Cello Aesthetic | 0/TBD | Not started | - |
| 4. Season-Prestige Cycle & Season 2 (Roots) | 0/TBD | Not started | - |
| 5. Seasons 3-4 (Canopy & Storm) | 0/TBD | Not started | - |