test(02): VERIFICATION → gaps_found after live UAT (4 first-impression UX gaps)
User dev-server walkthrough surfaced 4 functional UX gaps beneath the verifier's
24/24 structural PASS:
G1 (blocking) — no global page CSS → white halo around #1a1a1a canvas
G2 (blocking) — no first-run prompt after Begin → player confused
(A Dark Room rule needs the canonical first-prompt)
G3 (high) — tile outlines too dim → grid reads as 'gray check block'
G4 (medium) — gate visual at canvas (880, 384) reads as stray rectangle
Phase 3 watercolor deferral preserved — every fix uses Phaser primitives or
one CSS file, not painted assets. STATE.md → status: gaps_found.
Next: /gsd-plan-phase 2 --gaps
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
+9
-9
@@ -2,14 +2,14 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.0
|
||||
milestone_name: milestone
|
||||
status: in_progress
|
||||
stopped_at: "Phase 2 Wave 2 final plan (Plan 02-05 letter-settings-e2e) executed in sequential mode. 4 atomic commits: 26eb77a (sim/offline + auto-harvest + letter Ink + letter-renderer), 5d58d6c (Letter overlay + Settings UI + boot save lifecycle + clock injection), dd48696 (Playwright e2e for PIPE-07), 31f8ede (compost beat toast — Plan 02-04 deferral). 312/312 vitest tests green (was 264; +48 new); Playwright PIPE-07 spec exits 0 in 1.5s test runtime / 4s end-to-end; npm run ci exits 0. UX-02 / UX-10 / CORE-03 / CORE-11 / PIPE-07 / GARD-02 / GARD-04 requirements satisfied. Phase 2 vertical slice closed end-to-end on real authored content + real save round-trip + real offline catchup — could plausibly ship as a free standalone Season-1 prologue. URL-flag FakeClock injection landed cleanly first-try, production-guarded by import.meta.env.PROD. Compost-beat UI wired as a thin transient CompostToast (minimum-viable; Ink runtime path remains compiled + loadable for Phase 4+ swap-in). gray-matter dep auto-removed (Rule 3 blocking issue surfaced via the e2e — Buffer not defined in browser; replaced with 15-line parseFrontmatter helper; bundle dropped 2.2MB → 1.9MB). All 24 Phase-2 REQ-IDs structurally satisfied across the 5-plan set. Phase 2 ready for /gsd-verify-work."
|
||||
last_updated: "2026-05-09T15:08:00.000Z"
|
||||
status: gaps_found
|
||||
stopped_at: "Phase 2 executed end-to-end (5/5 plans, 312/312 vitest, Playwright PIPE-07 green, npm run ci exits 0). gsd-verifier scored 24/24 REQ-IDs structurally PASS and routed 6 tone/live-loop items to HUMAN-UAT.md. Live UAT (user dev-server walkthrough) surfaced 4 first-impression UX gaps that block phase sign-off — these are NOT Phase-3 aesthetic deferrals, they are minimum-viable functional UX gaps: G1 no global page CSS (white halo around dark canvas), G2 no first-run prompt after Begin (player confused — A Dark Room rule violated), G3 dim tile outlines (grid reads as 'gray check block'), G4 isolated gate visual (no surrounding wall context). Gaps documented in 02-VERIFICATION.md frontmatter (status: gaps_found). Phase 3 watercolor + cello deferral preserved — every G-fix uses Phaser primitives or one CSS file, no painted assets. HUMAN-UAT.md tone items (Lura voice, letter cadence) remain pending below the structural gaps and will be re-reviewed after gap closure. Next: /gsd-plan-phase 2 --gaps."
|
||||
last_updated: "2026-05-09T15:55:00.000Z"
|
||||
last_activity: 2026-05-09
|
||||
progress:
|
||||
total_phases: 8
|
||||
completed_phases: 1
|
||||
total_plans: 8
|
||||
total_plans: 12
|
||||
completed_plans: 12
|
||||
percent: 22
|
||||
---
|
||||
@@ -21,14 +21,14 @@ progress:
|
||||
See: .planning/PROJECT.md (updated 2026-05-08)
|
||||
|
||||
**Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins.
|
||||
**Current focus:** Phase 02 — Season 1 Vertical Slice (Soil) — ALL 5 PLANS DONE; ready for /gsd-verify-work
|
||||
**Current focus:** Phase 02 — Season 1 Vertical Slice (Soil) — 5/5 plans done + verifier 24/24 PASS, but live UAT found 4 first-impression UX gaps. Awaiting `/gsd-plan-phase 2 --gaps`.
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 02 (season-1-vertical-slice-soil) — 5/5 plans complete (all waves)
|
||||
Plans: 5 of 5 created (3 waves); Wave 0 (02-01) DONE; Wave 1 (02-02 + 02-03) DONE; Wave 2 (02-04 + 02-05) DONE
|
||||
Status: Plan 02-05 letter-settings-e2e executed in sequential mode — 4 atomic commits (26eb77a, 5d58d6c, dd48696, 31f8ede), 48 new tests (312/312 total vitest green), npm run ci exits 0, npx playwright test exits 0 in 1.5s. UX-02 / UX-10 / CORE-03 / CORE-11 / PIPE-07 / GARD-02 / GARD-04 satisfied end-to-end. Phase 2 vertical slice closed: a player can launch, plant, grow, harvest, meet Lura, leave the tab, return ≥5min later, see the letter from the garden in voice, dismiss to the live garden — and everything persists across reload (PIPE-07 e2e proves it). All 24 Phase-2 REQ-IDs structurally satisfied across the 5-plan set. The vertical slice could plausibly ship as a free standalone Season-1 prologue (banner concern #2's escape hatch realized).
|
||||
Last activity: 2026-05-09 -- Plan 02-05 execute complete; Phase 2 ready for verification
|
||||
Phase: 02 (season-1-vertical-slice-soil) — 5/5 plans executed; verifier 24/24 PASS; live UAT found 4 blocking/high gaps; status: gaps_found
|
||||
Plans: 5 of 5 created (3 waves); Wave 0 (02-01) DONE; Wave 1 (02-02 + 02-03) DONE; Wave 2 (02-04 + 02-05) DONE; gap-closure plan pending
|
||||
Status: All 5 Phase-2 plans executed cleanly (12 atomic feature commits + 5 doc commits). 312/312 vitest green; Playwright PIPE-07 e2e green in 1.6s; npm run ci exits 0. gsd-verifier scored 24/24 REQ-IDs structurally PASS and surfaced 6 inherently subjective tone/live-loop items in HUMAN-UAT.md. User ran the dev server (first live UAT) and reported 4 first-impression UX gaps that the test suite cannot detect: G1 white halo around dark canvas (no global page CSS), G2 no first-run prompt after Begin (A Dark Room rule violated), G3 tile outlines too dim against canvas bg, G4 gate visual stands alone with no wall context. All 4 are minimum-viable functional UX gaps — Phase 3 watercolor deferral preserved (every fix uses Phaser primitives or one CSS file). VERIFICATION.md updated to status: gaps_found with structured gap entries. The HUMAN-UAT.md tone items remain pending below the structural gaps.
|
||||
Last activity: 2026-05-09 -- Phase 2 execute complete; live UAT surfaced 4 UX gaps; awaiting /gsd-plan-phase 2 --gaps
|
||||
|
||||
Progress: [██░░░░░░░░] 22%
|
||||
|
||||
|
||||