verify(01): phase 1 verification — all 16 REQ-IDs PASS, CI green
ci / lint + test + validate-assets + build (push) Successful in 9m38s

All 16 Phase-1 requirements verified against the live codebase:
- CORE-01, CORE-04..CORE-10: scaffold builds; save layer (IDB + fallback,
  envelope, migrations, snapshots, persist, codec) all green (53 tests / 12 files)
- PIPE-01: Vite-native content pipeline; schema violation fails build
- PIPE-03: asset provenance gate; refused-sample fixture proves gate structure
- PIPE-05: both doctrine docs authored + 8 doc-lint assertions green
- PIPE-06: ci.yml runs npm run ci on every push + PR
- AEST-08: ProvenanceSchema 6 fields; CI gate on every commit
- AEST-09: human curation gate in place; IOU records Path C deferral to Phase 5
- STRY-09: /content/ convention established (vacuously satisfied in Phase 1)
- UX-13: anti-fomo-doctrine.md authored + review-enforced

Deferred (non-blocking): 10-20 real north-star images (AEST-09 Task 2) — Phase 5.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
2026-05-09 00:17:20 -04:00
parent d3410e207d
commit 49ba411a00
3 changed files with 462 additions and 55 deletions
+46 -22
View File
@@ -2,16 +2,16 @@
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: executing
stopped_at: "Phase 1 closure: Plans 01-01..01-04, 01-06, 01-07 complete; Plan 01-05 Task 1 (validator + refused-sample fixture) merged but Task 2 (1020 north-star reference images) awaits human curation per the planned checkpoint:human-verify gate. CI workflow shippable today (validator green with 0 assets; will continue green once images land). Next: /gsd-verify-work to UAT Phase 1, then human curation pass on north-star images, then /gsd-discuss-phase 2."
last_updated: "2026-05-09T03:56:45.284Z"
status: complete
stopped_at: "Phase 1 complete. All 16 REQ-IDs verified (CORE-01, CORE-04..CORE-10, PIPE-01, PIPE-03, PIPE-05, PIPE-06, AEST-08, AEST-09, STRY-09, UX-13). CI chain green: lint + 53 tests + validate-assets + build all exit 0. One known deferred item: 10-20 real north-star reference images (AEST-09 Task 2) recorded in 01-05-IOU.md — Phase 5 follow-up, does not block Phase 2. Next: /gsd-discuss-phase 2."
last_updated: "2026-05-09T00:20:00.000Z"
last_activity: 2026-05-09
progress:
total_phases: 8
completed_phases: 0
completed_phases: 1
total_plans: 7
completed_plans: 7
percent: 100
percent: 12
---
# Project State
@@ -21,22 +21,47 @@ progress:
See: .planning/PROJECT.md (updated 2026-05-08)
**Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins.
**Current focus:** Phase 01foundations-and-doctrine
**Current focus:** Phase 02Season 1 Vertical Slice (Soil) — READY TO BEGIN
## Current Position
Phase: 01 (foundations-and-doctrine) — AWAITING VERIFICATION + HUMAN CURATION
Plan: 7 of 7 complete (01-05 Task 2 partial — north-star image curation outstanding)
Status: All Phase-1 automation green; ready for /gsd-verify-work UAT and human curation pass on north-star reference set
Last activity: 2026-05-09 -- Plan 01-07 (CI workflow) complete; PIPE-06 enforced
Phase: 01 (foundations-and-doctrine) — COMPLETE (verified 2026-05-09)
Plan: 7 of 7 complete
Status: All 16 Phase-1 REQ-IDs verified; CI green; ready for Phase 2
Last activity: 2026-05-09 -- Phase 1 verification complete
Progress: [██████████] 100%
Progress: [█░░░░░░░░░] 12%
## Verification Results
**Phase 1 Overall Verdict:** PASSED
| REQ-ID | Status |
|--------|--------|
| CORE-01 | PASS — scaffold builds; <5s measurement is Phase 2 |
| CORE-04 | PASS — IDB + localStorage fallback; 4 tests green |
| CORE-05 | PASS — navigator.storage.persist() all 4 scenarios |
| CORE-06 | PASS — versioned envelope + CRC-32; tamper detection |
| CORE-07 | PASS — forward-only migration chain; synthetic v0→v1 |
| CORE-08 | PASS — last-3 snapshot retention; 5-then-3 invariant |
| CORE-09 | PASS — Base64 codec + 50MB DoS cap; round-trip test |
| CORE-10 | PASS — ESLint boundaries rule + Vitest proof |
| PIPE-01 | PASS — Vite-native loader; schema violation fails build |
| PIPE-03 | PASS — asset provenance gate; refused-sample fixture |
| PIPE-05 | PASS — both doctrine docs authored + doc-lint tests |
| PIPE-06 | PASS — ci.yml; 53 tests on every push |
| AEST-08 | PASS — ProvenanceSchema 6 fields; CI gate in place |
| AEST-09 | PASS (IOU) — curation gate exists; human decision recorded |
| STRY-09 | PASS (vacuous) — /content/ convention established |
| UX-13 | PASS — anti-fomo-doctrine.md; review-enforced |
Gates run: lint (exit 0), test (53/53 green, 12 files), validate:assets (2 assets valid), build (exit 0), compile:ink (exit 0), ci (exit 0).
## Performance Metrics
**Velocity:**
- Total plans completed: 7 (1 partial)
- Total plans completed: 7 (1 partial — 01-05 Task 2 deferred via IOU)
- Average duration: ~5 min (Wave 1 baseline 6min; Wave 2 plans 48min; Plan 07 ~2min)
- Total execution time: ~30 min across all of Phase 1
@@ -44,7 +69,7 @@ Progress: [██████████] 100%
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1. Foundations & Doctrine | 7/7 (1 partial) | ~30 min | ~5 min |
| 1. Foundations & Doctrine | 7/7 (complete) | ~30 min | ~5 min |
**Recent Trend:**
@@ -60,17 +85,18 @@ Progress: [██████████] 100%
Decisions are logged in PROJECT.md Key Decisions table.
Recent decisions affecting current work:
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering.
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering. COMPLETE.
- Phase 2 will ship Season 1 as a complete vertical slice that could *plausibly* ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
- Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
- Plan 01-01: scaffolded by hand (the official `npm create @phaserjs/game@latest` is interactive-only — `--template react-ts --yes` flags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted; `build` runs `tsc -b && vite build` so strict-TS gates every build. ESLint 9 installed → Plan 02 must use **flat config** (`eslint.config.js`), not legacy `.eslintrc.*`.
- Plan 01-01: pre-installed `fake-indexeddb@^6` here so Plan 03 doesn't have to re-edit `package.json`. All Phase-1 dep versions match RESEARCH.md exactly within their `^` ranges.
- Plan 01-07: minimum-viable CI workflow (49 lines) running `npm ci` + `npm run ci` on push/PR to main; ubuntu-latest only, Node 22 only, no matrix per CONTEXT user pushback against ceremony. The workflow's role is to refuse merges that break local `npm run ci`, nothing more. New CI gates (Phase 2 e2e, Phase 8 visual regression) are added by editing `package.json scripts.ci` (or new dedicated workflow files), not by editing `ci.yml` — the workflow stays stable across all future phases.
- Plan 01-07: `npm ci` (lockfile-strict) chosen over `npm install` per RESEARCH § Security Domain; `npm audit` deferred to Phase 8. `actions/setup-node@v4` with `cache: 'npm'` per RESEARCH CI Pitfall A — never cache `node_modules/` directly.
- Plan 01-05 Task 2 (north-star images): Deferred via Path C per 01-05-IOU.md. User decision: "I don't really want to deal with creating the art for this." Two placeholder PNGs committed with valid provenance sidecars. Real north-star curation deferred to Phase 5 when production-volume asset generation begins.
### Pending Todos
- **Plan 01-05 Task 2 (human curation):** 1020 hand-curated AI generations need to be committed to `assets/north-stars/` with provenance sidecars. Each must pass the curation gate (visual consistency, real-species-slightly-wrong, watercolor register). The validator (`npm run validate:assets`) is green today with 0 assets and will continue green when the images land. This is the only outstanding Phase 1 deliverable before `/gsd-verify-work`.
- **Plan 01-05 Task 2 (human curation) — Phase 5 follow-up:** 10-20 hand-curated AI generations committed to `assets/north-stars/` with provenance sidecars. Non-blocking for Phase 2 (no production AI assets until Phase 5+). Recorded in `01-05-IOU.md` with resolution path.
### Blockers/Concerns
@@ -78,20 +104,18 @@ Carry-forward banner concerns from research:
- **7-Season scope risk** is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
- **Story ends but the loop doesn't** — Season 7 end-state design landed in Phase 1 (`.planning/season-7-end-state.md`, PIPE-05 ✓); finite Roothold ceiling enforcement deferred to Phase 4 (SEAS-04); credits/coda rest-state to Phase 7 (SEAS-10).
- **AI asset style drift** — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 1020-image north-star reference set still pending human curation (Plan 01-05 Task 2 — AEST-09 partial); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).
- **Phase 1 partial closure:** Plan 01-05 Task 2 is the only outstanding deliverable. The CI workflow (Plan 01-07) is shippable today regardless. `/gsd-verify-work` can run after the curation pass.
- **AI asset style drift** — provenance schema + CI gate + refused-sample fixture landed in Phase 1 (Plan 01-05 Task 1, PIPE-03 + AEST-08 ✓); locked 1020-image north-star reference set deferred to Phase 5 per IOU (AEST-09 IOU); production-volume asset generation begins Phase 5+; visual regression testing in Phase 8 (PIPE-04).
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
Items acknowledged and carried forward:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| *(none)* | | | |
| AEST-09 | 10-20 real north-star reference images for visual regression baseline | IOU — Phase 5 follow-up | Phase 1 (01-05-IOU.md) |
## Session Continuity
Last session: 2026-05-09
Stopped at: Plan 01-07 (CI workflow) complete — `.github/workflows/ci.yml` (49 lines, Node 22, ubuntu-latest, single job) runs `npm ci` + `npm run ci` on push/PR to main. Local `npm run ci` exits 0 (lint clean / 53 tests pass / validator OK / build OK). Every Phase 1 success criterion now structurally enforced on every commit. Plan 01-05 Task 2 (north-star image curation) is the only outstanding deliverable — does not block CI workflow shipping. Phase 1 awaiting `/gsd-verify-work` UAT after the curation pass.
Resume file: .planning/phases/01-foundations-and-doctrine/01-07-ci-workflow-SUMMARY.md
Next action: human curation pass on `assets/north-stars/` (Plan 01-05 Task 2), then `/gsd-verify-work` to UAT Phase 1, then `/gsd-discuss-phase 2`
Stopped at: Phase 1 verification complete — VERIFICATION.md written, REQUIREMENTS.md updated (16 REQ-IDs marked Complete), STATE.md updated to `status: complete`. All gates green (lint, 53 tests, validate:assets, build, CI chain).
Next action: `/gsd-discuss-phase 2` to begin Season 1 Vertical Slice (Soil)