docs(01): plan phase 1 — 7 plans across 3 waves, verified after 1 revision
Wave 1: Plan 01 (scaffold + test infra)
Wave 2: Plans 02 (eslint firewall), 03 (save layer), 04 (content pipeline),
05 (asset provenance — autonomous:false human-curate checkpoint),
06 (doctrine docs)
Wave 3: Plan 07 (CI workflow)
All 16 Phase-1 REQ-IDs covered. Plan-checker found 4 blockers + 6 warnings
on first pass; revision iteration 1 landed all 10 fixes; iteration 2
returned VERIFICATION PASSED. Two orchestrator judgment calls during
revision: (1) implement CORE-04 localStorage fallback in Phase 1 (the
literal requirement and ROADMAP success criterion #2 both call for it),
(2) reclassify STRY-09 as vacuously satisfied in Phase 1.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
+7
-7
@@ -10,9 +10,9 @@ See: .planning/PROJECT.md (updated 2026-05-08)
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 8 (Foundations & Doctrine)
|
||||
Plan: 0 of TBD in current phase
|
||||
Status: Context gathered — ready for `/gsd-plan-phase 1`
|
||||
Last activity: 2026-05-08 — Phase 1 context discussed and committed; user locked AI pipeline to minimum-viable, save schema to minimal v1, doctrine docs to principle-level, Phase 1 scaffold capped at success criteria.
|
||||
Plan: 0 of 7 in current phase
|
||||
Status: Planned — ready for `/gsd-execute-phase 1`
|
||||
Last activity: 2026-05-08 — Phase 1 planning complete. RESEARCH.md → 7 plans across 3 waves → plan-checker found 4 blockers + 6 warnings → revision iteration 1 → VERIFICATION PASSED. Orchestrator authorized two judgment calls during revision: (1) implement CORE-04 localStorage fallback in Phase 1 (~30 LoC + 1 test) rather than defer (the literal requirement and ROADMAP success criterion #2 both call for it); (2) reclassify STRY-09 as vacuously satisfied in Phase 1 (no source code exists yet to externalize from).
|
||||
|
||||
Progress: [░░░░░░░░░░] 0%
|
||||
|
||||
@@ -27,7 +27,7 @@ Progress: [░░░░░░░░░░] 0%
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 1. Foundations & Doctrine | 0 | 0 | — |
|
||||
| 1. Foundations & Doctrine | 0/7 | 0 | — |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: —
|
||||
@@ -68,6 +68,6 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-05-08
|
||||
Stopped at: Phase 1 context gathered. User chose minimum-viable shape across all four gray areas (AI pipeline, save v1, doctrine docs, scaffold scope) — explicit pushback on overengineering recorded.
|
||||
Resume file: .planning/phases/01-foundations-and-doctrine/01-CONTEXT.md
|
||||
Next action: `/gsd-plan-phase 1`
|
||||
Stopped at: Phase 1 planning verified and ready for execution. Wave 1 = Plan 01 (scaffold + test infra). Wave 2 = Plans 02–06 (firewall, save layer, content pipeline, asset provenance, doctrine docs) in parallel; Plan 05 has a human-curate checkpoint (autonomous: false) for the 10–20 north-star reference set with Path A/B/C fallbacks. Wave 3 = Plan 07 (CI workflow).
|
||||
Resume file: .planning/phases/01-foundations-and-doctrine/01-VALIDATION.md (per-task verification map populated; all 16 Phase-1 REQ-IDs covered)
|
||||
Next action: `/gsd-execute-phase 1`
|
||||
|
||||