Current Position
Phase: 1 of 8 (Foundations & Doctrine) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-05-08 — Roadmap created, 77 v1 requirements mapped across 8 phases.
Progress: [░░░░░░░░░░] 0%
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: —
- Total execution time: 0.0 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1. Foundations & Doctrine | 0 | 0 | — |
Recent Trend:
- Last 5 plans: —
- Trend: — (no plans completed yet)
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering.
- Phase 2 will ship Season 1 as a complete vertical slice that could plausibly ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk.
- Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine.
Pending Todos
None yet.
Blockers/Concerns
Carry-forward banner concerns from research:
- 7-Season scope risk is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap.
- Story ends but the loop doesn't — Season 7 end-state design must land in Phase 1 (PIPE-05); finite Roothold ceiling enforced in Phase 4 (SEAS-04); credits/coda rest-state in Phase 7 (SEAS-10).
- AI asset style drift — provenance + curation + locked north-star reference set must land in Phase 1 (AEST-08, AEST-09, PIPE-03) before any production-volume asset generation in Phase 5+; visual regression testing in Phase 8 (PIPE-04).
Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none) |
Session Continuity
Last session: 2026-05-08
Stopped at: Roadmap created and committed; ready to begin Phase 1 planning.