--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: executing stopped_at: "Plan 01-01 (scaffold + test infra) complete. Phaser 4 + React 19 + Vite 8 + TS 6 scaffold builds; 15 deps installed at locked versions; 7 firewall directories ready; Vitest + Playwright wired with passing sentinel; package.json scripts pre-declared for the entire Phase 1 plan-set. Next: Wave 2 — Plans 02–06 in parallel (firewall, save layer, content pipeline, asset provenance, doctrine docs); Plan 05 has a human-curate checkpoint." last_updated: "2026-05-09T03:18:51Z" last_activity: 2026-05-09 -- Plan 01-01 (scaffold + test infra) complete progress: total_phases: 8 completed_phases: 0 total_plans: 7 completed_plans: 1 percent: 14 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-05-08) **Core value:** Every idle mechanic must function as a metaphor that the player absorbs without being told. When economy and meaning conflict, meaning wins. **Current focus:** Phase 01 — foundations-and-doctrine ## Current Position Phase: 01 (foundations-and-doctrine) — EXECUTING Plan: 2 of 7 (next: 01-02-eslint-firewall) Status: Executing Phase 01 Last activity: 2026-05-09 -- Plan 01-01 (scaffold + test infra) complete Progress: [█░░░░░░░░░] 14% ## Performance Metrics **Velocity:** - Total plans completed: 1 - Average duration: 6 min - Total execution time: 0.1 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1. Foundations & Doctrine | 1/7 | 6 min | 6 min | **Recent Trend:** - Last 5 plans: [01-01 scaffold-and-test-infra: 6 min — green] - Trend: — (1 of 7 plans complete; trend will form after Wave 2) *Updated after each plan completion* ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - Phase 1 will land all retrofit-hostile foundations (versioned saves, content/asset pipelines, sim/render firewall, anti-FOMO doctrine, Season 7 end-state design) before any feature code — research from all four researchers converged on this ordering. - Phase 2 will ship Season 1 as a complete vertical slice that could *plausibly* ship as a free standalone prologue ahead of Seasons 2-7, defending against the 7-Season scope risk. - Phases 4-7 deliver the remaining six Seasons in mechanic-introducing pairs (Season 2 alone with prestige, Seasons 3-4, Seasons 5-6, Season 7 alone) — at most one new mechanic per Season per the scope-defense doctrine. - Plan 01-01: scaffolded by hand (the official `npm create @phaserjs/game@latest` is interactive-only — `--template react-ts --yes` flags are silently ignored as of create-game v1.3.2); plan's documented fallback path was used. Vite 8 + TS 6 referenced-projects tsconfig layout adopted; `build` runs `tsc -b && vite build` so strict-TS gates every build. ESLint 9 installed → Plan 02 must use **flat config** (`eslint.config.js`), not legacy `.eslintrc.*`. - Plan 01-01: pre-installed `fake-indexeddb@^6` here so Plan 03 doesn't have to re-edit `package.json`. All Phase-1 dep versions match RESEARCH.md exactly within their `^` ranges. ### Pending Todos None yet. ### Blockers/Concerns Carry-forward banner concerns from research: - **7-Season scope risk** is the project's biggest risk; defended by the standalone-Season-1 escape hatch (Phase 2) and the one-mechanic-per-Season cap. - **Story ends but the loop doesn't** — Season 7 end-state design must land in Phase 1 (PIPE-05); finite Roothold ceiling enforced in Phase 4 (SEAS-04); credits/coda rest-state in Phase 7 (SEAS-10). - **AI asset style drift** — provenance + curation + locked north-star reference set must land in Phase 1 (AEST-08, AEST-09, PIPE-03) before any production-volume asset generation in Phase 5+; visual regression testing in Phase 8 (PIPE-04). ## Deferred Items Items acknowledged and carried forward from previous milestone close: | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | *(none)* | | | | ## Session Continuity Last session: 2026-05-09 Stopped at: Plan 01-01 (scaffold + test infra) complete. Phaser 4 + React 19 + Vite 8 + TS 6 scaffold builds; 15 deps installed at locked versions; 7 firewall directories ready; Vitest + Playwright wired with passing sentinel; package.json scripts pre-declared for the entire Phase 1 plan-set. Next: Wave 2 — Plans 02–06 in parallel. Resume file: .planning/phases/01-foundations-and-doctrine/01-01-scaffold-and-test-infra-SUMMARY.md Next action: continue `/gsd-execute-phase 1` (orchestrator dispatches Wave 2)