josh 38535bac73 docs(02-01): complete foundations plan
- 02-01-foundations-SUMMARY.md authored with frontmatter dependency
  graph, key-files manifest, decisions log, patterns established,
  test-count breakdown (72 new tests), TICK_MS=200 (no drift), and
  ESLint sim-purity rule landed (defended-option clause did not trigger)
- STATE.md: Phase 2 progress 1/5 plans (Wave 0 complete);
  velocity table updated with Plan 02-01 ~12min entry; decisions log
  cites BLOCKER 3 split, V1Payload extension, ESLint rule
- ROADMAP.md: Phase 2 row updated to 1/5; 02-01 plan marked [x] with
  duration + summary backlink
- REQUIREMENTS.md: CORE-02, CORE-03, CORE-11, UX-10, UX-11 marked
  complete with annotations; traceability table updated

Plan execution metrics:
- 3 atomic commits (58db532, fe99058, 2a8d354)
- 72 new tests across 9 test files (cushion above plan estimate of 54)
- Total test count: 128/128 green
- npm run ci exits 0
- Duration: ~12 min (sequential mode)
2026-05-09 09:26:37 -04:00
josh 63d2d8d5f7 docs(02): create phase 2 plan — 5 plans across 3 waves
Phase 2 (Season 1 Vertical Slice — Soil) plan set:
- 02-01 (Wave 0): foundations (BigQty + Zustand 5 store + tick scheduler + V1Payload extension + save lifecycle hooks + Phaser EventBus + ESLint sim-purity rule)
- 02-02 (Wave 1, parallel): Begin → Plant → Grow vertical slice
- 02-03 (Wave 1, parallel): Harvest → Journal → Compost + Season 1 fragments + PIPE-02 verification
- 02-04 (Wave 2, parallel): Lura's 3 Ink-authored gate beats (1st/4th/8th harvest, STRY-10)
- 02-05 (Wave 2, parallel): Letter + Settings + boot-path save lifecycle + Playwright PIPE-07 e2e

All 24 Phase-2 REQ-IDs covered across the plan set. VALIDATION.md per-task verification map filled (15 tasks); nyquist_compliant: true.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-09 02:45:56 -04:00
josh 8ace3db7b4 docs(01-07): complete ci-workflow plan + Phase 1 closure metadata
- 01-07-ci-workflow-SUMMARY.md: structural enforcement map, Phase 2/8 handoff notes, threat T-01-08 mitigation confirmed
- 01-VALIDATION.md: per-task table populated (12/13 green, 01-05-T2 partial — checkpoint:human-verify awaiting north-star image curation); status flipped to executed
- ROADMAP.md: progress table marks Phase 1 as 7/7 with 01-05 partial annotation
- STATE.md: position advanced to Plan 7 of 7 complete; performance trend; Plan 01-05 Task 2 explicitly tracked as the only outstanding deliverable; next action = human curation pass then /gsd-verify-work
- REQUIREMENTS.md: PIPE-06 marked complete (CI workflow runs Vitest on every push/PR)
2026-05-09 00:00:23 -04:00
josh 1e99356b27 docs(01-01): complete scaffold and test infra plan
Wave 1 of Phase 1 complete. Phaser 4 + React 19 + Vite 8 + TypeScript 6
scaffold builds (npm run build green); 15 Phase-1 deps installed at
locked versions; 7 architectural-firewall directories ready under src/;
repo-root /content/ + /assets/ trees ready; Vitest (happy-dom) +
Playwright wired with passing sentinel; package.json scripts
pre-declared for the entire Phase 1 plan-set so Wave 2 can run in
parallel without colliding on package.json.

3 deviations auto-fixed (1 blocking, 2 missing-critical):
1. Built scaffold by hand because @phaserjs/create-game v1.3.2 is
   interactive-only — plan's documented fallback path was used.
2. build script wraps tsc -b before vite build so strict-TS gates
   every build (CLAUDE.md Code Style invariant).
3. Added *.tsbuildinfo to .gitignore (TS 6 incremental cache files).

Wave 2 readiness: Plan 02 must use ESLint 9 flat-config format
(eslint.config.js); legacy .eslintrc.* not supported. fake-indexeddb
pre-installed for Plan 03 IDB tests. inkjs + inklecate installed but
no .ink files compiled (Phase 2 PIPE-02 owns that).
2026-05-08 23:23:15 -04:00
josh 39563f6934 docs(01): plan phase 1 — 7 plans across 3 waves, verified after 1 revision
Wave 1: Plan 01 (scaffold + test infra)
Wave 2: Plans 02 (eslint firewall), 03 (save layer), 04 (content pipeline),
        05 (asset provenance — autonomous:false human-curate checkpoint),
        06 (doctrine docs)
Wave 3: Plan 07 (CI workflow)

All 16 Phase-1 REQ-IDs covered. Plan-checker found 4 blockers + 6 warnings
on first pass; revision iteration 1 landed all 10 fixes; iteration 2
returned VERIFICATION PASSED. Two orchestrator judgment calls during
revision: (1) implement CORE-04 localStorage fallback in Phase 1 (the
literal requirement and ROADMAP success criterion #2 both call for it),
(2) reclassify STRY-09 as vacuously satisfied in Phase 1.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 23:09:08 -04:00
josh eecb79ae80 docs: create roadmap (8 phases) 2026-05-08 21:37:11 -04:00