josh e5d449095d docs(02-05): complete letter-settings-e2e plan
- 02-05-letter-settings-e2e-SUMMARY.md: full plan summary (frontmatter
  + decisions + REQ table + self-check). All 24 Phase-2 REQ-IDs
  structurally satisfied across the 5-plan set.
- STATE.md: marked Plan 02-05 complete; Phase 2 ready for
  /gsd-verify-work; progress 19% → 22%; next action set to verifier.
- ROADMAP.md: Plan 02-05 row marked [x] with duration + SUMMARY ref.
- REQUIREMENTS.md: UX-02 / UX-10 / CORE-03 / PIPE-07 marked complete
  with traceability annotations citing Plan 02-05's contribution;
  per-row Plan 02-05 references added to UX-02, UX-10, CORE-03;
  PIPE-07 traceability table row updated.
2026-05-09 11:16:02 -04:00