Commit Graph

1 Commits

Author SHA1 Message Date
josh 49ba411a00 verify(01): phase 1 verification — all 16 REQ-IDs PASS, CI green
ci / lint + test + validate-assets + build (push) Successful in 9m38s
All 16 Phase-1 requirements verified against the live codebase:
- CORE-01, CORE-04..CORE-10: scaffold builds; save layer (IDB + fallback,
  envelope, migrations, snapshots, persist, codec) all green (53 tests / 12 files)
- PIPE-01: Vite-native content pipeline; schema violation fails build
- PIPE-03: asset provenance gate; refused-sample fixture proves gate structure
- PIPE-05: both doctrine docs authored + 8 doc-lint assertions green
- PIPE-06: ci.yml runs npm run ci on every push + PR
- AEST-08: ProvenanceSchema 6 fields; CI gate on every commit
- AEST-09: human curation gate in place; IOU records Path C deferral to Phase 5
- STRY-09: /content/ convention established (vacuously satisfied in Phase 1)
- UX-13: anti-fomo-doctrine.md authored + review-enforced

Deferred (non-blocking): 10-20 real north-star images (AEST-09 Task 2) — Phase 5.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-05-09 00:17:20 -04:00