7 commits across 3 TDD tasks (RED + GREEN per task) + .gitkeep cleanup;
36 Vitest tests across 7 test files green; npm run build clean under
TypeScript strict; all 6 CORE requirements (CORE-04 through CORE-09)
covered by at least one assertion.
Key structural decision documented in SUMMARY: SaveDB is a single
common-contract interface, not a union of IDBPDatabase | LocalStorageDBAdapter.
The union shape failed TypeScript-strict at the build gate; the interface
refactor isolates the type-system cast to one location at openSaveDB().
Wave 1 of Phase 1 complete. Phaser 4 + React 19 + Vite 8 + TypeScript 6
scaffold builds (npm run build green); 15 Phase-1 deps installed at
locked versions; 7 architectural-firewall directories ready under src/;
repo-root /content/ + /assets/ trees ready; Vitest (happy-dom) +
Playwright wired with passing sentinel; package.json scripts
pre-declared for the entire Phase 1 plan-set so Wave 2 can run in
parallel without colliding on package.json.
3 deviations auto-fixed (1 blocking, 2 missing-critical):
1. Built scaffold by hand because @phaserjs/create-game v1.3.2 is
interactive-only — plan's documented fallback path was used.
2. build script wraps tsc -b before vite build so strict-TS gates
every build (CLAUDE.md Code Style invariant).
3. Added *.tsbuildinfo to .gitignore (TS 6 incremental cache files).
Wave 2 readiness: Plan 02 must use ESLint 9 flat-config format
(eslint.config.js); legacy .eslintrc.* not supported. fake-indexeddb
pre-installed for Plan 03 IDB tests. inkjs + inklecate installed but
no .ink files compiled (Phase 2 PIPE-02 owns that).
User locked four implementation decisions:
- AI asset pipeline: minimum-viable schema + sidecar provenance + CI gate;
vendor/model deferred to Phase 5; 10–20 hand-curated AI generations as
Phase 1 north-stars
- Save v1: minimal payload (Phase 2 fields only); synthetic v0→v1 migration
proves the chain works; first real migration ships in Phase 4
- Doctrine docs: anti-FOMO consolidation + Season 7 principle-level rest-state
contract; both in .planning/; no CI/lint enforcement
- Phase 1 scaffold caps at the 5 success criteria — BigQty, Zustand store, and
tick scheduler defer to Phase 2
Pushback recorded: user prefers minimum-viable infrastructure for support
systems; no ceremonial workflows.