2 Commits

Author SHA1 Message Date
josh 8ace3db7b4 docs(01-07): complete ci-workflow plan + Phase 1 closure metadata
- 01-07-ci-workflow-SUMMARY.md: structural enforcement map, Phase 2/8 handoff notes, threat T-01-08 mitigation confirmed
- 01-VALIDATION.md: per-task table populated (12/13 green, 01-05-T2 partial — checkpoint:human-verify awaiting north-star image curation); status flipped to executed
- ROADMAP.md: progress table marks Phase 1 as 7/7 with 01-05 partial annotation
- STATE.md: position advanced to Plan 7 of 7 complete; performance trend; Plan 01-05 Task 2 explicitly tracked as the only outstanding deliverable; next action = human curation pass then /gsd-verify-work
- REQUIREMENTS.md: PIPE-06 marked complete (CI workflow runs Vitest on every push/PR)
2026-05-09 00:00:23 -04:00
josh 39563f6934 docs(01): plan phase 1 — 7 plans across 3 waves, verified after 1 revision
Wave 1: Plan 01 (scaffold + test infra)
Wave 2: Plans 02 (eslint firewall), 03 (save layer), 04 (content pipeline),
        05 (asset provenance — autonomous:false human-curate checkpoint),
        06 (doctrine docs)
Wave 3: Plan 07 (CI workflow)

All 16 Phase-1 REQ-IDs covered. Plan-checker found 4 blockers + 6 warnings
on first pass; revision iteration 1 landed all 10 fixes; iteration 2
returned VERIFICATION PASSED. Two orchestrator judgment calls during
revision: (1) implement CORE-04 localStorage fallback in Phase 1 (the
literal requirement and ROADMAP success criterion #2 both call for it),
(2) reclassify STRY-09 as vacuously satisfied in Phase 1.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 23:09:08 -04:00